Financial Controlling

Prime Cost

Kiosa Glossary Financial Controlling By Sven Schneider · Updated July 2, 2026

Prime Cost is the sum of cost of goods (see Food Cost Ratio) and labor costs (see Labor Cost Ratio) — the two largest variable cost blocks in a restaurant. It is the only KPI that relates both to revenue at the same time and so shows the complete picture of profitability.

Formula

Prime Cost = Cost of goods + Labor costs

Prime Cost ratio = Prime Cost / Net revenue × 100

In Kiosa One View, cost of goods and labor come together in one data set from the POS, time tracking and cost of goods, so you don't have to assemble Prime Cost by hand.

Rating scale

Prime Cost ratio Rating
Below 55% Very good — strong profitability
55–60% Healthy — solid business
60–65% Borderline — optimisation needed
Above 65% Critical — profit margin under pressure

Reference values for orientation, not industry statistics. Concept, menu and location shift the values.

Why Prime Cost matters more than individual KPIs

A restaurant can have an acceptable labor cost ratio of 31% and still have total costs that are too high — if the cost of goods is at 35%. Prime Cost: 66%. Critical. Look only at the labor cost ratio and you miss the problem. Look at Prime Cost and you see the full picture.

At €2 million annual revenue, the difference between 60% and 65% Prime Cost is €100,000 profit per year.

Target values by concept

There is no documented industry statistic for Prime Cost. Use the table above as a guide and, above all, track your own trend per location and week. Fine dining has structurally higher labor costs, offset by higher prices.

Frequently asked questions

What is a good Prime Cost?

As a reference value (not an industry statistic), below 60% of net revenue is considered healthy and below 55% very good. From 65% the profit margin is seriously under pressure — then hardly anything is left after rent, energy and administration.

Why is the KPI called Prime Cost?

The term comes from American restaurant controlling and refers to the two primary cost blocks: cost of goods and labor. Together they make up the largest part of costs in most businesses; all other cost types are individually much smaller.

How do I reduce a Prime Cost that is too high?

Always pull both levers at once: labor costs through revenue-based scheduling and forecasting, cost of goods through recipe standards, purchasing and inventory discipline. Cutting on one side only shifts the problem: fewer staff with the same shrinkage gets you nowhere.

Are the monthly management accounts (BWA) enough to steer by?

No. The BWA (the German monthly management accounts) arrives from your accountant several weeks late, which is too slow to manage by. For Prime Cost you need same-day data from the POS system and time tracking, otherwise you are reacting to last month's problems.


Related terms


Track this KPI automatically

Kiosa calculates all restaurant KPIs automatically every day — for every location, without spreadsheets.

Book a Kiosa demo →