Prime cost = food cost + labor cost, measured as a share of net sales. As a rule of thumb, 55–60% counts as healthy (a reference value from practice, not an official statistic). Between 60% and 65% it gets tight, from 65% it's critical: then hardly any profit is left after rent and fixed costs. Prime cost is the most important steering KPI in a restaurant, because it looks at the two biggest cost blocks together instead of in isolation. You'll find both components, labor cost percentage and food cost percentage, with formulas among the eight most important restaurant KPIs.
Even so, it hardly appears in any monthly P&L or management report. Everyone talks about labor cost percentage. About food cost too. About the sum of the two: almost nobody. This article shows you why exactly that sum is your most important number, and how to calculate it, benchmark it and bring it down.
Contents
- What is prime cost?
- How to calculate prime cost
- Why prime cost steers better than labor or food cost alone
- Benchmarks by concept type
- 4 levers to reduce prime cost
- FAQ
- Your next steps
What is prime cost?
Prime cost is the sum of food cost and labor cost, divided by net sales. It combines a restaurant's two biggest cost blocks in a single number.
Why exactly these two? Because together they typically eat up 55 to 65% of your sales, and because they're the only large cost blocks you can steer in the short term. Rent is fixed in the lease. So is insurance. But how many hours are on next week's schedule and what your dishes cost to buy in, you decide. Every week, again.
In the US, prime cost has been the standard steering metric of the restaurant industry for decades. In Germany, where Kiosa comes from, it leads a shadow existence. Most businesses steer by labor cost percentage and food cost percentage separately, often even by different people in different systems. That's exactly where the problem lies.
How to calculate prime cost
The formula:
Prime cost = (food cost + total labor cost) / net sales × 100
You need to get three things right:
1. Food cost means usage, not purchasing. Food cost = opening stock + purchases − closing stock. If you simply add up the month's supplier invoices, you're measuring purchasing behaviour, not usage. A big stock-up at month end would otherwise distort the whole number.
2. Labor cost means all labor cost. Not just gross wages, but also employer social security contributions, employer's liability insurance, premiums, sick pay, holiday pay and bonuses. In Germany, actual labor cost is typically 25–32% above the bare gross payroll; the exact figure depends on your country's employer contributions. How to calculate it correctly is covered in detail in our article on restaurant labor cost percentage, or you can go straight to the labor cost calculator.
3. Net sales, not gross sales. VAT or sales tax isn't yours. If you calculate with gross sales, you make the percentage look artificially good.
Worked example
A full-service restaurant with €2.4 million net sales a year:
| Item | Amount | Percentage |
|---|---|---|
| Food cost | €696,000 | 29.0% |
| Total labor cost | €744,000 | 31.0% |
| Prime cost | €1,440,000 | 60.0% |
60%, right on the line between healthy and borderline. For this restaurant, a single percentage point of prime cost equals €24,000 of profit a year. Getting from 62% to 58% means €96,000 more profit. Without a single euro of extra sales.
The rating scale
| Prime cost | Rating |
|---|---|
| Below 55% | Very good: strong profitability |
| 55–60% | Healthy: a solid business |
| 60–65% | Borderline: optimisation needed |
| Above 65% | Critical: profit margin under pressure |
The 65% line comes from the cross-check: of 100% of sales, 65% goes on food and labor. That leaves 35% for rent (typically 8–12%), energy, insurance, marketing, maintenance, music licensing, depreciation, interest. And your profit. At 65% prime cost, often only 2–5% is left after all fixed costs. One weak month, a broken cold room, a wage increase, and you're in the red.
Why prime cost steers better than labor or food cost alone
Labor and food cost are communicating vessels. If you only look at one of them, you see half the picture, and make the wrong decisions.
Example 1: the good labor cost percentage that isn't
A restaurant with a 31% labor cost percentage. Sounds solid for full service. But food cost is 34%, because a lot of convenience products are bought in: ready-made sauces, pre-cut vegetables, finished desserts. Prime cost: 65%. Critical.
The business has turned labor cost into food cost. Fewer kitchen hours, more expensive purchasing. If you only look at labor cost percentage, you celebrate an optimisation that isn't one.
Example 2: the low food cost that was bought dearly
The reverse case: everything homemade, pasta, sauces, bread, desserts. Food cost: a strong 24%. But production needs two extra full-time staff in the kitchen, and labor cost percentage is 38%. Prime cost: 62%. Borderline.
Here too: neither of the two individual percentages tells the truth. Only the sum shows whether the system as a whole is working profitably.
The real strength: make-or-buy becomes measurable
Almost every operational decision in a restaurant shifts costs between the two blocks:
- Homemade vs. convenience → labor vs. food
- Closing the kitchen earlier vs. a smaller evening menu → labor vs. sales vs. food
- Centralising prep (with several locations) → labor down, logistics costs up
With two separate percentages you can't evaluate these decisions; each percentage only shows its side of the shift. Prime cost shows the net effect. That's why it's the KPI you use for structural decisions, not just operational ones.
Benchmarks by concept type
First: in Germany there's no uniform official industry statistic for prime cost. The following ranges are therefore planning examples, not representative benchmarks. Always check them against your concept, depth of service, region and your own historical data.
| Concept type | Prime cost range | Note |
|---|---|---|
| Quick service | 50–56% | Standardised processes, limited depth of service |
| Casual dining | 55–61% | The broad middle |
| Full-service restaurant | 57–63% | More service, more scratch cooking |
| Fine dining | 60–68% | High product quality + high staffing density |
| Bar / drinks-led | 45–55% | Drinks margins push the percentage down |
Two notes on reading this:
First: the split within prime cost varies widely. Two worked examples (fictional): a trattoria with homemade pasta is more likely to sit at 26% food / 33% labor. A steakhouse more like 34% food / 26% labor. Both can land at 59–60% prime cost, and both are healthy. The sum is what counts.
Second: lower isn't automatically better. A prime cost of 48% in a full-service restaurant almost always means too few staff on the floor or purchasing that's too cheap. Both come back to bite you in reviews, lost regulars and staff turnover. Prime cost has to sit within the corridor, not on the floor.
4 levers to reduce prime cost
1. Sales-based scheduling
The biggest single lever on the labor side. Instead of fixed weekly schedules, planned hours follow expected daily sales: a Tuesday with a €4,000 forecast gets fewer hours on the schedule than a Saturday with €12,000.
That sounds obvious, but most restaurants don't do it, because the sales forecast is missing or scheduling runs separately from sales reporting. Bringing the two together typically gains 1–3 percentage points of labor cost, in our experience, without cutting a single position.
2. Recipes and portion control
The biggest single lever on the food side. Three questions you need to be able to answer: what does each dish on the menu cost in food, at current purchase prices? Are recipes followed in the kitchen? And where does waste occur?
Most restaurants have recipes that were costed two years ago. Since then purchase prices have risen, and often selling prices too, but nobody knows whether the ratio still holds. A quarterly recipe review regularly uncovers 2–3 dishes that have quietly turned into margin traps.
3. Actively steer the menu mix
Prime cost is a weighted average: every dish sold pulls it up or down with its own food cost. That means you can lower the percentage without changing a single price or shift, just by shifting the sales mix.
Place dishes with a high contribution margin more prominently, have the team recommend them actively, build them into set menus. Take dishes off the menu that cost margin and rarely get ordered. How to do this systematically is shown in our article on menu engineering. You can calculate the contribution margin per dish in the menu price calculator, and how many checks you need per day to cover your fixed costs in the break-even calculator.
4. Measure weekly instead of finding out monthly
The least spectacular lever, and the one with the biggest long-term effect. If you only see prime cost in the monthly P&L, you see it 4 to 8 weeks late. In that time a whole planning cycle has passed in which nobody could correct course.
Weekly means: sales from the POS, hours from staff planning, deliveries from supplier invoices, brought together into one number per location every week. With discipline, that works in a spreadsheet too. From three or four locations, it realistically only works automated, because the data sits in separate systems and pulling it together by hand every morning eats time nobody has.
From analysis to action
What this is about: managing labor and food cost together.
Put it into practice:
More on KPIs, sales and forecasting
- Restaurant KPIs: 8 Metrics with Formulas, Rhythm and Examples
- Restaurant Dashboard: Morning Check and Selection Criteria
- Restaurant Labor Cost Percentage: How to Calculate and Benchmark It
FAQ
What is a good prime cost for a restaurant?
As a rule of thumb, 55–60% of net sales counts as healthy; below 55% is very good. Between 60% and 65% action is needed; above 65% the profit margin is seriously at risk. The range shifts with the concept type: quick service tends to run at 50–56%, fine dining can carry 60–68%, provided prices are costed accordingly.
What goes into prime cost?
On the food side: total usage of food and drink (opening stock + purchases − closing stock), including waste and staff meals. On the labor side: all labor cost, meaning gross wages, employer contributions, employer's liability insurance, premiums, sick pay and bonuses. In owner-operated businesses, an imputed owner's salary belongs in too, otherwise you're comparing yourself with benchmarks you only hit on paper.
How often should I calculate prime cost?
Weekly per location. Monthly isn't enough, because otherwise a whole planning cycle passes between deviation and correction. Daily is usually too granular for prime cost; food cost fluctuates too much from day to day because of delivery dates. The weekly rhythm smooths that out and is still fast enough to correct course.
What's the difference between prime cost and contribution margin?
Contribution margin is a per-dish metric (net selling price minus food cost); prime cost is a metric for the whole business (food plus labor relative to sales). The two belong together: contribution margin steers your menu and costing, prime cost steers your business. Shifting the menu mix towards dishes with a strong contribution margin automatically lowers prime cost.
My prime cost is above 65%. Where do I start?
First the diagnosis: is the problem on the food side or the labor side? Compare both individual percentages with the ranges for your concept type. If food cost is too high, start with a recipe review and a waste analysis. If labor cost is too high, start with sales-based scheduling. If both sit at the upper end, check your selling prices first. Often the problem isn't the cost side, but a menu that hasn't been re-costed for years.
Your next steps
Labor cost calculator: calculate your real labor cost percentage including all on-costs. It's one half of your prime cost, and the most common calculation mistake sits right here.
Restaurant labor cost percentage: the in-depth article on the second component: calculation, benchmarks, 5 levers.
30 minutes well spent. Want to see your prime cost weekly per location, without pulling numbers together from three systems every morning? Book a demo call and I'll show you what that looks like with real data.